top of page

Tamworth Base Hospital

  • Writer: hr30325
    hr30325
  • Jan 24, 2019
  • 1 min read

Updated: Nov 27, 2020

Belmore Engineering was commissioned by Abi Group Richard Crookes Joint Venture to supply and erect the structural steelworks for the Tamworth Base Hospital as part of a four stage redevelopment of the Tamworth Rural Referral Hospital.







Client: Abi Group Richard Crookes Joint Venture

Construction Time: 19 months - Completed September 2015

Size of Project: 200 tonnes of steel





Comments


bottom of page