Following the erection of the heavy vehicle workshop at the Christmas Creek mine site, Belmore Engineering was asked to build the Surface Miner workshop on the same site.

Client: National Buildplan Group
Construction Time: 2 months
Size of Project: 220 tonnes of steel

Comments