top of page

Surface Miner, Western Australia

  • Writer: Belmore Engineering
    Belmore Engineering
  • Aug 14, 2018
  • 1 min read

Following the erection of the heavy vehicle workshop at the Christmas Creek mine site, Belmore Engineering was asked to build the Surface Miner workshop on the same site.

ree

Client: National Buildplan Group

Construction Time: 2 months

Size of Project: 220 tonnes of steel

ree


Comments


bottom of page