Surface Miner, Western Australia
- Belmore Engineering
- Aug 14, 2018
- 1 min read
Following the erection of the heavy vehicle workshop at the Christmas Creek mine site, Belmore Engineering was asked to build the Surface Miner workshop on the same site.

Client: National Buildplan Group
Construction Time: 2 months
Size of Project: 220 tonnes of steel

Comments